You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaksel Bangun Saluran di Petukangan Utara
.
photo Mustaqim Amna - Beritajakarta.id

Channel Development in Petukangan Utara Accelerated

South Jakarta Water Resources (SDA) Sub-agency is speeding up the water channel development as long as 50 meters on Jalan Palem VIII, Petukangan Utara, Pesanggrahan.

The channel to have 70 centimeters width with 2 meters height

Its development has been carried out since May 10 and is targeted to be complete in early July.

Maintenance Division Head Junjung said 12 personnel and 1 heavy equipment have been alerted to the location.

Absorption Wells Construction in Sawah Besar Accelerated

"The channel to have 70 centimeters width with 2 meters height. Right now we have entered 15 days," he expressed, Monday (5/25).

It is a proposed priority activity undertaken to deal with floods and inundation in the surrounding area.

"If it has been completed, the flow of water from residential areas can be smooth when the rainy season," he stated.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1043 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye908 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye552 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye448 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye386 personAldi Geri Lumban Tobing