You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jaksel Bangun Saluran di Petukangan Utara

Channel Development in Petukangan Utara Accelerated

South Jakarta Water Resources (SDA) Sub-agency is speeding up the water channel development as long as 50 meters on Jalan Palem VIII, Petukangan Utara, Pesanggrahan.

The channel to have 70 centimeters width with 2 meters height

Its development has been carried out since May 10 and is targeted to be complete in early July.

Maintenance Division Head Junjung said 12 personnel and 1 heavy equipment have been alerted to the location.

Absorption Wells Construction in Sawah Besar Accelerated

"The channel to have 70 centimeters width with 2 meters height. Right now we have entered 15 days," he expressed, Monday (5/25).

It is a proposed priority activity undertaken to deal with floods and inundation in the surrounding area.

"If it has been completed, the flow of water from residential areas can be smooth when the rainy season," he stated.

Linked News
Popular News indeks
  1. Indonesia-Singapore Match: 80 Dishub Personnel Deployed to Manage Traffic Around GBK

    access_time25-09-2026 remove_red_eye718 personAldi Geri Lumban Tobing
  2. Jakarta International Stadium Sets Up Transit Schemes for The Weeknd Concert

    access_time24-09-2026 remove_red_eye522 personAldi Geri Lumban Tobing
  3. Pramono: Climate Action Must Deliver Tangible Benefits to Residents

    access_time25-09-2026 remove_red_eye349 personDessy Suciati
  4. Jakarta Inspectorate Partners with KPK to Foster Early Anti-Corruption Culture

    access_time20-09-2026 remove_red_eye322 personFolmer
  5. Ready for an Island Getaway? Join Us at Maritime Festival 2026 on Kelapa Island!

    access_time20-09-2026 remove_red_eye276 personAnita Karyati